ZPEC First Large Borehole Well in Iraq Rumaila Oilfield Successfully Drilled

2023-11-23

On November 7, 2023, Well RU-581, the first large borehole directional well drilled by ZPEC Rig 35 in the Rumaila Oilfield, was successfully completed 9.12 days ahead of schedule. While demonstrating ZPECs speed and technology with its strength, it was also highly recognized by Party A.


Well Ru-581 is a Main Pay S-type production well with a designed depth of 3,392 meters and an actual completion depth of 3,378 meters, with 867 meters displacement. The designed drilling and completion period was 62.04 days and the actual drilling and completion was 52.92 days, which was 9.12 days ahead of schedule.


During drilling operations, large borehole wells have higher technical requirements for displacement, lifting systems, drilling tool performance, etc. In response to these changes, ZPEC Team formulated preventive measures in advance for risks in each link and replaced the 5.5 inch double shoulder drill strings and actively optimized the drill bits to ensure that the mechanical drilling speed and directional ability met the requirements. During the operation, they overcame the risks of shale instability and pressure differential and worked closely with the Casing Team to successfully run the production casing, ensuring excellent cementing quality in the target layer.

(ZPEC Iraq Company /Gong Xiang, ZPEC Oilfield Service/Han Lihui, Liu Zewei)?







copyright ? 2021 中曼石油天然氣集團(tuán)股份有限公司 . ALL RIGHTS RESERVED 滬ICP備08116516號(hào)-1

小恩雅透明内抹油,荒唐的山区mU子,男女一上一下的软件,ヘンリー冢本videos,良娣收藏不迷路,51mh.ifnocc官网入口,sHKD脱狱者,怪物粗XXⅩXX无尽,火辣辣内江市教育welcome,糖心VIog官方入口