ZPEC Fully Committed to Start-up of Saudi Drilling Project

2021-05-07



During the International Labor Day holidays, the employees of ZPEC’s two major bases, Shanghai and Chengdu, gave up their vacation time with families to work overtime to catch up with the rushed construction schedule to ensure that the two rigs of the Saudi Drilling Project were delivered on time.

On March 28, 2021, Zhongman Petroleum and Natural Gas Group Corp. Ltd. (ZPEC ) and Saudi Arabia Oil Company (Saudi Aramco) signed a $120M USD contract (~787M RMB) for drilling projects. Since the beginning of April, ZPEC Equipment Group Company has been responsible for the manufacturing of two sets of 850 Drilling Rigs. Under the arrangement and deployment of the Company, ZPEC’s Shanghai Base has undertakethe design, installationand commissioning of mud pumps, generator roomsand other parts. At the ZPEC Chendu Base, the Kunlun Company undertook the welding production of mud tanks and skids, while the Electric Control Company undertook the installation and production of the electric control room, electrical equipment, etc. The Shanghai and Chengdu Basesas well as the related cooperative manufacturerscomplement each other's advantages and clear division of work while doing everything possible to fulfill the task on time. At present, the manufacturing work of the two sets of drilling righas come to an end.  This marks the first time after completion that rigs will be shipped to the site of the Saudi Drilling Project.


copyright ? 2021 中曼石油天然氣集團股份有限公司 . ALL RIGHTS RESERVED 滬ICP備08116516號-1

小恩雅透明内抹油,荒唐的山区mU子,男女一上一下的软件,ヘンリー冢本videos,良娣收藏不迷路,51mh.ifnocc官网入口,sHKD脱狱者,怪物粗XXⅩXX无尽,火辣辣内江市教育welcome,糖心VIog官方入口