ZPEC Rig 11 Successfully Delivers Its First Well in Mahu Oilfield

2021-04-12

At 3:00am on April 5th, 2021, ZPEC Rig 11 successfully completed the cementing job of FNHW4091 Well of Mahu Oilfield with total depth of 4,354 meters, which was 19.83 days ahead of schedule. This is the best operational performance in the Fengnan Block of the Mahu Oilfeild.  ZPEC Rig 11 was named Red Flag Drilling Team by Party A and awarded 20,000 RMB.

(ZPEC 11 Mr. Huabin, Wang)


copyright ? 2021 中曼石油天然氣集團股份有限公司 . ALL RIGHTS RESERVED 滬ICP備08116516號-1

小恩雅透明内抹油,荒唐的山区mU子,男女一上一下的软件,ヘンリー冢本videos,良娣收藏不迷路,51mh.ifnocc官网入口,sHKD脱狱者,怪物粗XXⅩXX无尽,火辣辣内江市教育welcome,糖心VIog官方入口