603619
Stock code
(%)
At 11:00 am on April 3rd Iraq local time, the Majnoon Oilfield MJ-70 Well was successfully finished, creating the shortest well construction cycle record in this oilfield above the Mishrif formation depth. The unremitting efforts of the ZPEC Rig 28 Drilling Team were praised by Party A, Shell, and Halliburton. Their congratulations were expressed via a letter to all staff. (Reported by Zhang Chi)
copyright ? 2021 中曼石油天然氣集團股份有限公司 . ALL RIGHTS RESERVED 滬ICP備08116516號-1