ZPEC Rig15 Breaks 30,000 Meters Footage Mark

2017-11-23

At 23 o'clock on November 15th, ZPEC rig 15 reached 30,000 meters footage and became the first rig who have done this in the Wushenqi block.(Reported by Li Qin)

copyright ? 2021 中曼石油天然氣集團(tuán)股份有限公司 . ALL RIGHTS RESERVED 滬ICP備08116516號-1

小恩雅透明内抹油,荒唐的山区mU子,男女一上一下的软件,ヘンリー冢本videos,良娣收藏不迷路,51mh.ifnocc官网入口,sHKD脱狱者,怪物粗XXⅩXX无尽,火辣辣内江市教育welcome,糖心VIog官方入口