603619
Stock code
(%)
In the early November Iraq local time, in accordance with the requirements of the project department and Party A, ZPEC rig 16 take precautions to carry out safety inspections to eliminate electrical hazards for the safe production of the rainy season.(Reported by Yang Qian)
copyright ? 2021 中曼石油天然氣集團(tuán)股份有限公司 . ALL RIGHTS RESERVED 滬ICP備08116516號(hào)-1