Successful Perforation of Gazprom Project P18 Well

2017-08-15

On the evening of July 26th Baghdad local time, the perforation job of Well P18, drilled by ZPEC Drilling Team 26, came to a successful conclusion. The perforation rate of 100% demonstrated again the excellent performance of the team and reflects the strength of ZPEC. (Reported bu Wang Zhiqin)

 

copyright ? 2021 中曼石油天然氣集團(tuán)股份有限公司 . ALL RIGHTS RESERVED 滬ICP備08116516號(hào)-1

小恩雅透明内抹油,荒唐的山区mU子,男女一上一下的软件,ヘンリー冢本videos,良娣收藏不迷路,51mh.ifnocc官网入口,sHKD脱狱者,怪物粗XXⅩXX无尽,火辣辣内江市教育welcome,糖心VIog官方入口