603619
Stock code
(%)
On the evening of July 26th Baghdad local time, the perforation job of Well P18, drilled by ZPEC Drilling Team 26, came to a successful conclusion. The perforation rate of 100% demonstrated again the excellent performance of the team and reflects the strength of ZPEC. (Reported bu Wang Zhiqin)
copyright ? 2021 中曼石油天然氣集團(tuán)股份有限公司 . ALL RIGHTS RESERVED 滬ICP備08116516號(hào)-1