ZJ40J rig manufactured by KPEM is delivered to Shanbei

2009-09-28

From September 25th ,ZJ40J rig which is manufactured by KPEM will be delivered to Dingbian of Shaanxi province by three group, It is estimated that  the entire goods will arrive at destination before National Day. Group President Li went to delivering site when he inspected and instructed work at KPEM, he encouraged staff do their duty, to ensure no mistake in delivering work.
The ZJ40J rig is teem with full spirit of KPEC staff which is rebuilt from Da Ding 130 rig, company arranged plan carefully at confirming of rebuilt project, designing of drawing, delivering locale and transportation, the performance of production would raised so much by using advanced technology. This project accomplished favorably is successful breakthrough of our company in old rig rebuilt area.(He Donglei)

copyright ? 2021 中曼石油天然氣集團(tuán)股份有限公司 . ALL RIGHTS RESERVED 滬ICP備08116516號(hào)-1

小恩雅透明内抹油,荒唐的山区mU子,男女一上一下的软件,ヘンリー冢本videos,良娣收藏不迷路,51mh.ifnocc官网入口,sHKD脱狱者,怪物粗XXⅩXX无尽,火辣辣内江市教育welcome,糖心VIog官方入口