Mud Logging Team 16 Completes Gazprom Well BD2 35 Days Ahead of Schedule

2016-12-02
At 10:00 am on the morning of November 30th Iraqi local time, ZPEC Drilling Team 16 successfully finished Well BD2 of the GAZPROM Project in the Basra Oilfield, Iraq.  During the operation, ZPEC Logging Team 16 accomplished their work 35 days ahead of schedule through their outstanding performance. Upholding the concept of innovation, truth-seeking, integrity, and excellence, the team finished their work under difficult conditions in the remote desert and they, along with other operations of the team, received high commendations from GAZPROM. (Reported by Pang Chong)

copyright ? 2021 中曼石油天然氣集團(tuán)股份有限公司 . ALL RIGHTS RESERVED 滬ICP備08116516號(hào)-1

小恩雅透明内抹油,荒唐的山区mU子,男女一上一下的软件,ヘンリー冢本videos,良娣收藏不迷路,51mh.ifnocc官网入口,sHKD脱狱者,怪物粗XXⅩXX无尽,火辣辣内江市教育welcome,糖心VIog官方入口